Project Review Kerr Engineering was engaged by the lead contractor for a recent heavy lift in Darwin NT to manufacture the main 600T rated lifting beams. Scope of work: Manufacture of the stressed beam sections in accordance with ISO 3834.2 : 2008 Machining of end...
Project Review Kerr Engineering were engaged by a major drilling operator to adapt a mud tank sourced from overseas to meet their specific requirements for local operations. Due to an immediate operational requirements this work needed to be completed in a compressed...